 
							
						
															
					
					 by bsyden | Jun 17, 2015 | Engineering, Projects, Recreational
The State of New York has developed a program to revitalize the Erie Canalway Trail. As part of the revitalization, the state will be completing the 348 mile Canalway bicycle and pedestrian facility. This project includes construction for a 2.1 mile segment along the...				
					
				
					
											
								 
							
						
															
					
					 by bsyden | Jun 17, 2015 | Engineering, Projects, Transportation
Laberge Group was retained to develop a Corridor Management Plan for North Genesee Street to assist in guiding public and private growth which would benefit both the corridor and the balance of the City. The corridor was separated into three segments for this study,...				
					
				
					
											
								 
							
						
															
					
					 by bsyden | Jun 17, 2015 | Engineering, Projects, Transportation
Laberge Group was retained by the City of Albany to design six (6) new traffic signals within the City limits.  The signals were necessary to improve efficiency and to modernize the existing antiquated intersection controls.  One of the signals was a replacement of an...				
					
				
					
											
								 
							
						
															
					
					 by bsyden | Jun 17, 2015 | Engineering, Projects, Transportation
Forty (40) corrugated and concrete pipe culverts, ranging in size from 18 inches to 48 inches, were lined using cured in place liners. This contract was the first time the Albany Division put cured in place lining out for bid. Laberge Group was tasked with overseeing...				
					
				
					
											
								 
							
						
															
					
					 by bsyden | Jun 17, 2015 | Engineering, Projects, Wastewater
Laberge Group was retained by the Town of Shandaken for the planning, design and construction of a new 200,000 gpd wastewater treatment plant and collection system under the New Infrastructure Program of the New York City Watershed Regulations. As part of our...				
					
				
					
											
								 
							
						
															
					
					 by bsyden | Jun 17, 2015 | Construction, Engineering, Projects
Laberge Group was retained by the Town of Lake Pleasant in response to a Notice of Violation (NOV) issued by the Department of Environmental Conservation.  Services included completing an independent facility inspection to validate completeness of the NOV and identify...