by bsyden | May 13, 2015 | Engineering, Water
Prior to the improvements, the Village had been utilizing untreated water from the Village of Herkimer’s raw water viaduct. Regulatory requirements of the Surface Water Treatment Rule required that the water be filtered or that a new source be found. In addition, a...
by bsyden | Apr 15, 2015 | Engineering, Projects, Recreational
Floating Dock Facility Laberge Group was responsible for the design of a public floating dock facility to function as an occasional mooring for the sailing vessels Hudson River Sloop Clearwater and the Halfmoon, located at the existing River Front Park site in...