by bsyden | Jun 17, 2015 | Engineering, Projects, Transportation
Forty (40) corrugated and concrete pipe culverts, ranging in size from 18 inches to 48 inches, were lined using cured in place liners. This contract was the first time the Albany Division put cured in place lining out for bid. Laberge Group was tasked with overseeing...