by bsyden | Aug 27, 2015 | Engineering, Projects, Wastewater
Village Wide Sewer System Evaluation This project involved the cleaning and video inspection of the storm sewer and sanitary sewer system. From the video inspection determined – what if any – rehabilitation of the sewer system(s) was required. Laberge...
by bsyden | Jun 17, 2015 | Engineering, Projects, Wastewater
Laberge Group was retained by the Town of Shandaken for the planning, design and construction of a new 200,000 gpd wastewater treatment plant and collection system under the New Infrastructure Program of the New York City Watershed Regulations. As part of our...
by bsyden | Jun 17, 2015 | Engineering, Projects, Wastewater
Environmental Compliance Report Wastewater Treatment Laberge Group was retained by the Village of Kiryas Joel to prepare a Wastewater Treatment Facilities Compliance Report for their sewage treatment plant. The report was subject to an Order on Consent with the NYS...
by bsyden | Jun 17, 2015 | Engineering, Projects, Wastewater
Excessive Infiltration and Inflow (I/I) in municipal sanitary sewage collection systems and collapsing or broken clay and asbestos cement sewers are quite common in Mohawk Valley communities. Laberge Group was retained by the Village of Fultonville to provide CDBG...
by bsyden | Jun 17, 2015 | Engineering, Projects, Wastewater
Laberge Group was retained by the Village of Kiryas Joel to perform Wastewater Plant Improvements. We needed to solve a long-standing problem with the RBC (Rotating Biological Contactor) units at their wastewater treatment facility. At the time, one of the three (3)...
by bsyden | May 13, 2015 | Engineering, Wastewater
Laberge Group ultimately determined that while it was not cost effective to treat all of the Town’s wastewater at a new Town-owned facility, a new plant could economically treat a large portion of the current and future sewer service areas. During the negotiation...